Construction guide for Welmax Tile adhesives

CONSTRUCTION SURFACE PREPARATION

- The surface of the construction floor must be flat, firm, clean, free from grease, dirt and other impurities.
- If constructed under high temperature and direct sunlight, watering the surface shall be required to reduce the temperature. Carrying out maintenance after its completion.

PRODUCT MIXING OPERATION

- Prepare 5-6 liters of clean water (or adhesive strengthening solution) in a bucket, slowly add the adhesive powder in and mix them well.
- Use a mixer with slow speed until the mixture has a homogeneous plasticity, stop for about 3-5 minutes to allow its chemical reaction, continue mixing and the mixture is ready.

PRODUCT APPLICATION

- Soaking Tiles and stones in water can be skipped, but make sure the surface are dry and clean before applying.
- Use a notched trowel to evenly apply the adhesive mixture to the surface of the wall or floor. Create an extra layer of adhesive 2-5mm thick on the back of the tiles or stones to increase the bond in-between as well as to avoid peeling and cracking tiles & stones.
- Place and align tiles or stones to the tiling position, use a rubber hammer (or a vibrator) to tap evenly on the surface to ensure that the material is evenly spread and firmly adhered.
- Clean tiles or stones surface with a damp sponge.
- The adhesive mixture should be used up in about 4 hours, do not have it exposed to direct sunlight.
- Walk gently after 24 hours.

CAUTION WHEN USING

- Products are based on cement that can cause allergies when contact.
- Avoid direct contact with skin and eyes, wash with clean water when it is attached to the body. Wear gloves and glasses when working.
- Keep out of reach of children.

PRODUCT PRESERVATION

- Store in a dry place, do not place directly on the floor, do not stack more than 10 bags. Expiry date: 12 months.